Home » Hazmat Survey Prep

Pre-Demolition Asbestos and Hazardous Materials Survey Prep in Sacramento, CA

Before any building is demolished in Sacramento, California law requires a hazardous materials survey. This is not a recommendation. It is a legal requirement. The survey identifies dangerous materials inside the structure so they can be safely removed before demolition starts.
We coordinate the full pre-demolition process for Sacramento property owners and general contractors. This includes the certified asbestos survey, the SMAQMD Rule 902 notification, abatement coordination, and demolition permit clearance. One contact handles all of it.

Get Estimate

Statutory Mandates • Federal, State & Air District

Why a Hazardous Materials Survey Is Required Before Demolition in Sacramento

Three layers of law require a hazardous materials survey before any demolition project in Sacramento.

Federal law

The EPA’s NESHAP (National Emission Standards for Hazardous Air Pollutants) requires an asbestos survey and notification before demolition of regulated facilities.

State law

California’s Cal/OSHA Title 8, Section 1529 sets the Asbestos Standard for construction and demolition work. This applies to all contractors and workers on a demolition site.

Local law

SMAQMD Rule 902 is the Sacramento Metropolitan Air Quality Management District’s local regulation. It requires a certified survey and a 10-business-day notification before demolition begins. It applies to all demolition projects in the Sacramento area.

All three of these rules apply at the same time. Meeting one does not replace the others. We make sure your project meets all three before demolition starts.

Geotechnical Compliance

What Is Engineered Backfill and Why It Matters

Project shutdown

SMAQMD and Cal/OSHA can stop your project immediately if demolition begins without a completed survey and notification. A stop-work order means lost time and money for everyone on the job.

Fines and penalties

Fines for NESHAP and Cal/OSHA violations can reach tens of thousands of dollars per violation per day. These fines apply to both the contractor and the property owner.

Personal liability

If workers or neighbors are exposed to asbestos, lead, or PCBs during unpermitted demolition, the property owner can face civil lawsuits. In serious cases, criminal charges under federal EPA law are also possible.

Permit denial

The City of Sacramento and Sacramento County will not issue a demolition permit without the required survey report and SMAQMD notification on file.

Simple rule:

If the structure was built before 1980, assume hazardous materials are present until a certified survey proves otherwise. Do not skip this step.

Who Performs the Survey: The Certified Asbestos Consultant (CAC)

A pre-demolition hazardous materials survey must be performed by a State of California Certified Asbestos Consultant, also called a CAC. A home inspector or general contractor cannot legally perform this survey.

Inspection (R&D Survey)

First, the CAC inspects all accessible areas of the structure. This includes attics, crawl spaces, behind walls, roofing, mechanical rooms, and basements. This type of inspection is called a Refurbishment and Demolition Survey (R&D Survey). It is invasive. The CAC takes physical samples of any material suspected of containing asbestos or other hazardous substances.

NVLAP Lab Analysis

Next, those bulk samples are sent to an NVLAP-accredited laboratory for analysis. Lab analysis typically costs about $22 per sample. Rush analysis is available when your schedule requires faster results.

Survey Report Issued

After that, the CAC writes the survey report. This report lists all hazardous materials found, where they are located, how much is present, and what abatement is recommended. This report is required for both the SMAQMD notification and the demolition permit.

SMAQMD Rule 902: Sacramento's Asbestos Notification Requirement

SMAQMD stands for the Sacramento Metropolitan Air Quality Management District. SMAQMD enforces local air quality rules for the Sacramento region. Rule 902 covers asbestos emissions from demolition and renovation projects.

Here is what Rule 902 requires:

First, a thorough asbestos survey must be done before demolition begins. Second, SMAQMD must be notified at least 10 business days before the project start date. Third, this notification is required for ALL demolition projects, even if the survey finds no asbestos.
Also, for renovation projects, notification is required when 100 square feet or more, or 100 linear feet or more, of regulated asbestos-containing material will be disturbed.
The start and end dates in the notification must be accurate. If your project schedule changes, SMAQMD must be updated with the new dates. Not updating SMAQMD is treated as a separate violation.

What goes into the SMAQMD notification:

SMAQMD contact:

Execution Sequence • Regulatory Roadmap

Our 10-Step Process: From Hazardous Materials Survey to Demolition Permit

We manage every phase with Sacramento municipal agencies so your timeline stays predictable and legally compliant.

01

Free Pre-Demolition Consultation

We review your project, the building age, and the location. We confirm which jurisdiction applies: City of Sacramento or Sacramento County. We outline what is required, how long it takes, and what it will cost. This consultation is free.

02

Hire a Certified Asbestos Consultant (CAC)

We coordinate with an independent, California-certified CAC to schedule the survey. The CAC must be a separate firm from the demolition and abatement contractor. This is required by California regulations to avoid conflicts of interest.

03

Invasive Building Inspection (R&D Survey)

The CAC inspects all accessible areas: attics, crawl spaces, behind walls, roofing, mechanical rooms, and basements. This is a Refurbishment and Demolition Survey. It is more thorough than a standard management survey. Physical bulk samples are taken from any suspected materials.

04

Laboratory Analysis

Bulk samples are sent to an NVLAP-accredited laboratory for analysis. Standard turnaround costs approximately $22 per sample. Rush analysis is available when you need faster results.

05

Survey Report Issued

The CAC prepares a written report. The report lists all hazardous materials found, their locations, quantities, and abatement recommendations. This report is the key document for your SMAQMD notification and demolition permit application.

06

SMAQMD Notification Filed

We file the SMAQMD Rule 902 notification at least 10 business days before your project start date. The notification includes the survey results and all required project details. Even if no hazardous materials are found, the notification must still be filed for demolition projects.

07

Abatement Coordination (If Required)

If the survey finds regulated materials, a Cal/OSHA-registered abatement contractor removes them. All regulated material is contained, removed, and transported to an approved disposal facility. We coordinate the abatement contractor and schedule to reduce delays.

08

Abatement Clearance Documentation

The abatement contractor provides waste disposal manifests. These documents confirm that all regulated materials have been legally removed and disposed of. This paperwork is required before the demolition permit is issued.

09

Demolition Permit Application

With the survey report, SMAQMD notification confirmation, and abatement documents in hand, we apply for the demolition permit. City of Sacramento projects use the eTRAKiT portal. Sacramento County projects use the Accela portal.

10

Mechanical Demolition Begins

Once the permit is issued, demolition starts. Silica dust controls and worker protection measures are in place throughout the project per Cal/OSHA requirements.

Why Sacramento Property Owners and GCs Choose Us

Local Sacramento knowledge

We know SMAQMD Rule 902, the City of Sacramento permit process, and Sacramento County requirements. We have done this process many times across the Sacramento region.

One point of contact

We coordinate the CAC, abatement contractor, SMAQMD notification, and demolition permit. You do not manage multiple vendors.

Schedule protection

Pre-demolition hazmat delays are the most common cause of project schedule overruns. We manage the timeline from day one to keep your project moving.

C-21 Licensed

We hold the California Class C-21 Demolition Contractor license required for this work.

Complete compliance documentation

We provide all survey reports, SMAQMD notifications, abatement manifests, and disposal records for your permit file.

Free consultation

We review your project requirements at no charge before you commit to anything.

Serving Sacramento County and Surrounding Areas

We provide pre-demolition asbestos survey coordination and hazardous materials prep services throughout the Sacramento region.

Cities and areas we serve:

Get In Touch

Direct Coordination Unit • Immediate Response

Ready to Start Your Pre-Demolition Survey Prep?

We coordinate the entire process: from the certified hazmat survey to the SMAQMD notification, abatement, and demolition permit clearance. One contact. No gaps. No schedule surprises.

Questions & Answers

Frequently Asked Questions

Do I need a hazardous materials survey before demolishing my home in Sacramento?
Yes. California law under Cal/OSHA Title 8 Section 1529 and EPA NESHAP, and local SMAQMD Rule 902, require a hazardous materials survey before any demolition project. This applies to all structures, not just homes built before 1978.
SMAQMD Rule 902 is the Sacramento Metropolitan Air Quality Management District’s rule governing asbestos from demolition and renovation projects. It requires a certified survey and a 10-business-day notification before demolition starts. It applies to all demolition projects in the Sacramento area, including residential projects.
Only a State of California Certified Asbestos Consultant (CAC) can perform a legally valid pre-demolition hazmat survey. A home inspector or a general contractor cannot do this. We coordinate with licensed, independent CACs on behalf of our clients.
You still must file the SMAQMD notification at least 10 business days before demolition begins. The survey report must accompany the notification, even if no hazardous materials were found.
From hiring the CAC to receiving the survey report typically takes 1 to 2 weeks. SMAQMD notification adds a mandatory 10-business-day waiting period. Abatement, if required, adds more time. Total time from first consultation to demo permit is typically 3 to 5 weeks for a standard residential project.
No. California law requires a Cal/OSHA-registered abatement contractor to remove regulated materials. DIY asbestos or lead removal on a structure scheduled for demolition is not permitted. It can result in serious fines and project shutdowns.
Residential surveys typically range from $600 to $1,500. Commercial surveys range from $2,000 to $5,000 or more depending on building size. Lab sample analysis adds about $22 per sample. Contact us for a free consultation. We will review your specific project and give you a clear cost picture.